Special/Critical Inspections

Progress Inspections

The code explains that progress inspections “shall be made during the progress of work to verify substantial compliance with the code and with approved construction documents”.

The number of code-mandated tests is based on the square footage of the project,and the locations of such tests are to be uniformly distributed throughout the project area where the loads would be imposed to the soils. Depending on the condition of the soils, additional testing may also be required by the design professionals to evaluate slope stability, stratigraphy, soil-bearing capacity, and/or instability due to liquefaction The number of code-mandated tests is based on the square footage of the project,and the locations of such tests are to be uniformly distributed throughout the project area where the loads would be imposed to the soils. Depending on the condition of the soils, additional testing may also be required by the design professionals to evaluate slope stability, stratigraphy, soil-bearing capacity, and/or instability due to liquefaction

 Progress Inspections

Our team of over 100 quality professionals are ready to support you

ENGAGE WITH AN EXPERT TODAY

WANT TO GET ORIGINAL INSPECTION & TESTING TIPS & LINKS STRAIGHT TO YOUR INBOX?

WELL, YOU CAN

Engage with an Expert